The 2 12 number is rise over run or two units of vertical for every 12 units horizontal.
Minimum roof pitch nh.
They provide excellent weather resistance great value and now more than ever a tremendous range of beautiful designs and color blends.
The minimum requirement is 2 12.
To get the minimum pitch for a metal roof the vertical rise per foot is divided by the horizontal slope.
Asphalt shingles continue to be the most widely installed roof covering option in north america.
The minimum roof slope for metal roofs is dependent upon the roof profile.
Shingles of all types need to have a slope to function properly.
The profile is the shape taken by the sheets when you bend them to form panels.
With regards to metal roofing the profile refers to the shape adopted by the metal sheets when they are bent to form the panels.
The values given here.
The minimum slope of a roof depends on the roof s profile.
Minimum pitch for metal roof.
The minimum roof slope allowed by code for any type of roof is in 12 applicable only to coal tar pitch roof systems.
The minimum pitch for a roof is 1 4 12 which translates to 1 4 inch rise to 12 inches of run.
The following table provides the minimum required allowable roof slope for each type of roofing material mentioned in the code.
Express the slope of a metal roof by a ratio which indicates the pitch of the roof.
However you can only use this pitch with built up roofing or specialized synthetic roofing.
The short simple answer is 2 12 has traditionally been considered the absolute minimum acceptable roof slope suitable for asphalt shingles.